Headquarters
ChuangYuan Industrial Zone,Longgang area, Shenzhen City ,Guangdong ,China.
All products are manufactured under strict SOPs and verified to meet UL/CE/RoHS/REACH requirements with 100% electrical testing.




Find the Right Storage Interconnects













Our pre-terminated and pre-assembled solutions eliminate on-site termination, reducing labor costs and installation errors.
We provides solutions for data centers, aerospace, defense, and medical industries, ensuring mission-critical reliability in every application.
Standard samples take 3–7 days; custom samples take 7–14 days (material-dependent). Flexible MOQs. Typical production lead time is 2–4 weeks. Monthly capacity and peak-season plans are available.
We follow IPC/WHMA-A-620. Every cable has lot/serial traceability with saved electrical, visual, and dimensional records, traceable to raw-material batches.
Yes, we specialize in custom cable assemblies designed to meet the specific needs of high-density, AI-driven data center environments.
Options include Slim SAS/low-profile connectors, custom splits, defined minimum bend radius, and routing guidance. Thermal A/B test data available on request.
Follow Us